THE INFRASTRUCTURE LAYER

Kuro Infrastructure

Kuro builds the datacentres. Modular, DLC-cooled, and switchable between Bitcoin mining and AI compute — with minimal rebuild cost.

0 MW

Finland — Previously largest DLC mining Farm in Europe
Grid. Converting to AI compute now.

0 MW

Finland — Greenfield Grid.
Purpose-built AI datacentre. Land, permit and connection secured.

0 MW

USA – Across 4 sites in Texas and Indiana
A mix of grid and self generation. All sites currently under construction.

Kuro Infrastructure

Modular Datacentre Developer

Designs, builds and operates DLC- cooled modular datacentres switchable between BTC mining and AI compute. 70 MW in Finland (previously used for BTC mining) with an extra 100 MW (greenfield) under development.

ASIC Ownership

We own the mining machines outright. No infrastructure liability. Maximum flexibility.

Flexible Deployment

ASICs go where conditions are best — Kuro facilities or third- party datacentres globally.

Integrated Advantage

When deployed inside Kuro facilities powered by Kylix Energy, Knox benefits from the lowest possible electricity costs.

Pure Mining Focus

Dedicated entirely to Bitcoin mining efficiency and hash rate optimisation. No distractions.

Knox Compute Installs the ASICs

Bitcoin mining machines deployed inside Kuro’s facility, powered by Kylix’s low-cost electricity

Knox Compute

Bitcoin mining, ASIC deployment and hosting arrangements.

Scroll to Top