THE INFRASTRUCTURE LAYER

Kuro Infrastructure

Kuro builds the datacentres. Modular, DLC-cooled, and switchable between Bitcoin mining and AI compute — with minimal rebuild cost.

0 MW

Finland — Previously largest DLC mining Farm in Europe
Grid. Converting to AI compute now.

0 MW

Finland — Greenfield Grid.
Purpose-built AI datacentre. Land, permit and connection secured.

0 MW

USA – Across 4 sites in Texas and Indiana
A mix of grid and self generation. All sites currently under construction.

Kuro Infrastructure

Modular Datacentre Developer

Designs, builds and operates DLC- cooled modular datacentres switchable between BTC mining and AI compute. 70 MW in Finland (previously used for BTC mining) with an extra 100 MW (greenfield) under development.

Modular by Design

DLC-cooled containers deployable for BTC or AI. Swap the compute layer, not the infrastructure.

Proven at Scale

Built and operated Europe’s largest DLC-cooled hydro-powered BTC facility. Previously 99% uptime.

BTC → AI Conversion

The 70 MW Finland facility is actively converting. Engineering partners appointed.

Strategic Locations

Six sites across Finland and the US. 565 MW of secured capacity.

Kuro Infrastructure Builds the Datacentre

Modular DLC-cooled containers deployed on site for AI (hosting) or BTC mining (self or hosting).

Kuro Infrastructure

Datacentre hosting, colocation and infrastructure partnerships.

Scroll to Top